Xinzheng Industrial Park,Qingyuan West Street,Weifang Economic Development Zone,Shandong,China
diesel generator  +86 15905360231    diesel generator  huaquan@huaquanpower.com
Current Location:HOME > generator 700kva price > The turbocharger >
The turbocharger
Update:2017-02-27 Tags:generator

Damage to the generator generatorof the turbocharger, we replaced the new turbocharger, check the oil pressure is normal, but when generator run 30 minutes or so, the turbocharger turbine shell to become red. However, generator turbine shell material is cast iron, if the diesel engine is normal, so the turbine shell won't appear the phenomenon of red. So, we found that under the condition of the diesel generator overload operation, the check valve clearance within a specified range, find diesel generator fuel supply advance Angle too late to adjust the fuel delivery advance Angle not wrong.

Copyright Weifang Huaquan Power Machinery Co.,Ltd
Powered by Huaquan