Xinzheng Industrial Park,Qingyuan West Street,Weifang Economic Development Zone,Shandong,China
diesel generator  +86 15905360231    diesel generator  huaquan@huaquanpower.com
Current Location:HOME > generator 700kw > The inpection before starting the generator >
The inpection before starting the generator
Update:2017-02-18 Tags:generator

Generator installment and overhaul,before starting the generatordiesel generator, we should check the followings:

(1) check the generator body parts installation is completed, complete.

(2) check the exciter commutator and generator surface of slip ringis clean, brush is complete, brush holder spring pressure is without the jam phenomenon (without exciter ).

(3) check the cooler installation is complete, air tight, cooler air should be drained. Check whether the installation of complete auxiliary cooling system.

(4) check the control signal, and checking the security system is whether installed, and do experiments show that everything is in good condition.

Copyright Weifang Huaquan Power Machinery Co.,Ltd
Powered by Huaquan